Home Gallery Trial Wall
Begining the excavation for the test wall.Excavation - 1 Kind of a 'worst case' scenario.Excavation - 2 The foundation should be as level as possible.Gravel Bed Place base plates carefully - solid lip to the back.Base Plates Trial fit of first few wall units.First Rows - 1
Rear view of trial fitting.First Rows - 2 Wrap drain pipe in landscape fabric and lay on back lip of base plate.Drain Pipe Back filling with drainage rock.Gravel Fill Correct use of geo-grid is very important with any segmental block retaining wall.Geo-Grid - 1 Progressing nicely.Half-Way
Back fill must be compacted - preferably with a power vibrator.Back Filling Geo-grid must stretch at least 3 feet from the back of the wall.Geo-Grid - 2 Ready for more backfill.Geo-Grid - 3 Wall units must be staggered from row to row so joints don't line up and weaken the structure.Getting There Getting close and looking good.Nearly Done
Load testing finished wall.Done - With Load A little more back fill and we'll be done.Top Caps On That's it! Too bad it's at the back of the factory and not in front of your house :) .Finished Wall